Anyway pictures taken today. Enjoy the pictures. Pls pardon the messiness 0.O
Living Room
- Elmark ceiling fan repaired
- Wall colour completed. Main wall - Lavendar Mist, Common walls - Ivory
- Halogen for Swarovski Crystal Ceiling Light installed. The crystal will be put up at a later date.
- Shoe cabinet installed (Carpenter removed bottom 2 shelvings to saw to a smaller piece from the original slanted design as Hazel feels that slanting waste space and will therefore be not enough space to house her shoes collection)
- Workers knock off 2 big piece of wall (edge) when fixing our shoe cabinet (right side of 2nd pic) :(
Balcony
- Shoe cabinet installed (Carpenter removed bottom 2 shelvings to saw to a smaller piece from the original slanted design as Hazel feels that slanting waste space and will therefore be not enough space to house her shoes collection)
- Workers knock off 2 big piece of wall (edge) when fixing our shoe cabinet (right side of 2nd pic) :(
Balcony
- Changed from original 1 "Milo-Gong" ceiling light to 2 coz not suitable for use at bathroom. Plastering to be done to removed casing.
Storeroom
- "Hamburger" ceiling light. Cheap and good.
Kitchen
-Cabinets up but subject to touch ups etc.
- Rinnai Hood installed
- Franke sink installed
- Counter solid top fixed
- Dish rack fixed
- Lightings fixed
- Black sparkles glass backing to be touched up with black putty
- Bar top to be installed
Common Bathroom
- Cabinets up
- Leaking found in the cabinets fixed
- Toilets accessories fixed (except for mirror which we just bought from Ikea. $9.90 is such a steal!)
- Basically the toilet is in a war state. All the rubbish are not cleared!
- Pending much rectifications and touch ups to be done
- Rimfrost pendant ceiling lamp @ $25 replaced with the lost hamburger light. Same light as the MBR toilet. Had to run to 2 Ikea stores before we finally found the stock at Ikea Tampiness. Phew
Guest Room
- Barley White paint colour up (But we were quite disappointed with the effect. But its ok since mostly for our guests or parents :P )
- Close up of ceiling light up for both common rooms
Study Room
- Mulberry room colour was better than what we expected it to be. It turn out really nice. The workers did a good job. We like our cozy study room! :D
Master Bedroom
- Painter painted the wrong colour for our feature wall colour. We wanted Sandstone and not Lavendar mist. :(
- Main lighting up. Cove light, down light and halogen (spotlight) up.
- Wardrobe installed. Subject to some touch ups.
- Plastic wrapper not removed yet
- Closeup of ceiling light
- Vanity table installed
Master Bedroom Bathroom
- Sorry for bad quality with handphone camera. Somehow the feature tiles behind the mirror turn out to be red under the capture -_-
- Mirror and toilet accessories installed
- Rainshower installed. Shower screen will be up soon.
- Need major cleaning and clearing up rubbish. All our wall and floor tiles are so dirty.
- Choking cleared.
- Same ceiling light as the common bathroom. Replaced with previously installed "Milo gong" as it is really not bright. Not feasible for bathroom use.
- Closeup of ceiling light
- Vanity table installed
Master Bedroom Bathroom
- Sorry for bad quality with handphone camera. Somehow the feature tiles behind the mirror turn out to be red under the capture -_-
- Mirror and toilet accessories installed
- Rainshower installed. Shower screen will be up soon.
- Need major cleaning and clearing up rubbish. All our wall and floor tiles are so dirty.
- Choking cleared.
- Same ceiling light as the common bathroom. Replaced with previously installed "Milo gong" as it is really not bright. Not feasible for bathroom use.